
A level-access wet area built on correct falls and full tanking, so it drains properly on day one and stays watertight for years, not just until the first winter.
4.9 on Google · £10m public liability insurance · 1-year workmanship guarantee
£10m
Public liability insurance
1 year
Workmanship guarantee
7 years
Tiling experience
4.9
Google rating
From £55/m²
Fixed tiling prices
A wetroom has no tray or enclosure: the whole floor is waterproofed and formed to fall to a drain, so water runs away rather than pooling. With nothing to contain the water, every part of the tiled area has to be properly tanked and correctly sloped.
The work covers forming the falls, tanking floor and walls, fitting a linear or centre drain, and tiling to a layout that works with the fall. It applies to full conversions, level-access shower rooms and wetroom-style en-suites.
Wetrooms suit step-free access, a cleaner look with no tray edge, and loft conversions or extensions where there is not enough depth for a tray. Because everything depends on the waterproofing and the fall, preparation is not optional: a fall that is slightly out sends water to the wrong low spot.
What it costs to leave it
The most common failure is standing water: a floor that looks fine dry but puddles after a shower because the fall was never formed accurately. It rarely shows until the room is in daily use, and by then fixing it means lifting the tiling.
The more serious failure is water passing the tanking into the structure below. Any gap at a junction, upstand or drain collar gives water a route into the joists or slab, which on a timber floor can mean a stained ceiling within months and a strip-back to the deck.
Both are avoidable: falls set out and checked before tiling, and tanking installed as a complete system. On a wetroom, the preparation matters more than the tiling above it.
How the work runs
Step 1
James assesses the room, agrees whether a linear or centre drain suits the space, and confirms floor build-up and finished levels before quoting a fixed price.
Step 2
The floor is built up and screeded or formed to fall evenly to the drain across the whole tiled area, checked with a level rather than judged by eye.
Step 3
A full waterproofing membrane is installed to the floor and walls, with the drain fitted and tested before any tiling begins.
Step 4
Tiles and grout lines are set out to run with the fall towards the drain, with mitred returns to any niche or bench, and careful cutting around the drain itself.
Step 5
The finished floor is checked for correct drainage before handover, and the work carries a 1-year workmanship guarantee.
Falls are checked with a level across the whole floor, not estimated, so water runs to the drain rather than sitting in low spots.
Tanking is taken across the floor and up the walls with junctions and the drain collar sealed properly, protecting the structure beneath.
Level-access design does not mean a lesser-quality room, mitred edges, tight joints and correct fall are all still delivered to the same standard as a tray-based shower.
Wetroom work is priced after a site visit as a fixed job, with payments staged so you are never paying for work not yet done.
Full insurance is in place while work involving floor structure and waterproofing takes place in your home.
The finished wetroom is covered for a year from handover, giving confidence the falls and tanking have been done properly.
Linear drains suit wetrooms where a single, discreet fall towards one wall is wanted, and they work well with large-format tiles because the floor only needs to fall in one direction. Centre drains suit smaller or squarer rooms and mean the floor falls evenly from all sides towards the middle.
Tile choice affects how forgiving the fall is to lay to: smaller formats and mosaic sit more naturally across a sloped floor with less risk of visible lippage, which is why shower floors within wetrooms are often finished in mosaic even when the rest of the room is large-format porcelain.
Wetrooms are priced per job after a site visit, because forming the falls and floor build-up varies significantly from room to room. You will be given a fixed price before work begins, with tiling itself starting from £55 per m².
A wetroom takes longer than a standard tray-based shower because of the fall formation and tanking, so allow more time in the schedule than for a typical bathroom refit. An exact timescale is agreed at the site visit.
Most bathrooms can, but floor build-up, joist depth and existing drainage all need checking first. This is assessed during the site visit before a price is confirmed.
A 1-year workmanship guarantee applies to the completed installation, covering the tiling and the standard of work carried out.
Both, depending on the room shape and your preference; this is discussed and agreed as part of the initial site visit.
Falls are formed and checked with a level across the whole floor before tiling starts, and the finished floor is checked again before handover.
Yes, including Tunbridge Wells, Sevenoaks, Bromley, Orpington, Maidstone, Tonbridge and the wider South East London area.
Call 07863 778208 Monday to Saturday, Monday to Saturday, between 7am and 9pm, to arrange a visit and get a fixed price.



Sevenoaks · Tunbridge Wells · Chislehurst · Orpington · Goudhurst · West Malling · Beckenham · Bromley · Maidstone · Tonbridge · Sidcup · Bexley · Swanley · Dartford · Petts Wood · West Wickham · Pembury · Edenbridge · Westerham
See all service areasNext step
Send a few details and James will arrange a site visit and a clear written quote, no obligation, no pressure. Prefer to talk it through first? Call 07863 778208, Mon–Sat, 7am–9pm.
Call 07863 778208Tell James about the job and he'll come back with a clear, fixed price.
Typically answered the same working day, Mon–Sat, 7am–9pm.